Hard surfacing for residential properties, built from the ground up
Driveways, patios, pathways and courtyard areas, installed in a fixed order: the ground layer is set out, excavated, built up and compacted before the surface layer is laid. Every project is measured on site and priced per square metre.
Paving rarely fails on its own. It moves, dips or holds water because of what is beneath it. That is why the ground layer is planned, dug and compacted before a single slab or block is placed, and why the order of work is the part of the job we talk about first.
What we install, in the order we install it
01 — 06
Driveway installation
The area is set out and excavated, a sub-base is built up and compacted in layers, falls are formed for drainage, and the paving is then laid, restrained at the edges and jointed.

Patios & courtyards
Levels are agreed against the property first, the ground is excavated and compacted, and the paving is laid to consistent joints with edges held in place and falls taken away from the building.

Pathways & walkways
The route is set out from the door or entrance, the ground is opened and compacted, and the surface is laid to a width and fall suited to how the path is walked.

Ground preparation
Set out, excavation, sub-base, compaction and drainage are completed and checked as a stage of their own, before the surface layer is started.

Repairs & resurfacing
The existing surface is examined, the failed areas are lifted, the base underneath is corrected, and the new surface is laid to meet the surrounding finish.

Finishing & detailing
With the surface down, edges are restrained, joints are filled, levels are checked across the whole area, and the site is cleared.

Set out
The area is marked out and finished levels are agreed against the property.

Excavate
The existing surface and any unsuitable ground are removed to the depth the new build-up requires.

Sub-base
A graded sub-base is brought in and spread in layers across the prepared area.

Compact
Each layer is compacted before the next is placed, so the build-up finishes dense and even.

Drainage
Falls and any drainage runs are formed so water moves away from the building and off the surface.

Edge & joint
Edges are restrained, joints are filled, and the finished levels are checked before handover.